The subsidy is in the the pre-construction phase, IIRC, i.e. land sold to the HA at a discount by LAs, and the tying-in of groundwork to existing services infrastructure being paid for by the LAs.
They can't help with either direct construction costs, or through rent subsidy because both are illegal AFAICR.